Close
Overlay

chandrakumar perumal -

chandrakumar perumal
Send Message
Connect

Chandrakumar's Trophies

Premium Member Not Completed SaleSpider Trophy Image

About Chandrakumar Perumal

chandrakumar+perumal
Chandrakumar Perumal and is interested in Energy.
Not the person you're looking for?
Find more results for Chandrakumar Perumal

Location

Categories of Interest

Energy

Resume

[pic]

Personal Data

Name: CHANDRAKUMAR PERUMAL

Date of Birth: 27th March 1962

Nationality: Malaysian

Residence Address: No 27 JALAN USJ 4/6D Subang Jaya

Petaling Jaya Selangor Darul Ehsan

Telephone: +6012 - 3396 728 / +603-8023 6261

Email Address: chandrau@streamyx.com

Marital Status: Married

Education/Qualification: B.E in Electrical First Calss with
(65 percentage)

ANNA University of Chennai,
India

Technical/Qualification: Technician

Institut Latihan
Sultan Ahmad Shah Lembaga letrik Negara

Computer Skills: MS Word, Excel, Project Schedule and CMMS

Language Spoken: English, Bahasa Malaysia, Tamil

Language Written: English, Bahasa Malaysia

Present Basic Salary: RM 18,000.00 per month

Expected Basic Salary Nego

Overseas Allowance USD 60.00 per day

Accommodation and Food Provided by Company



Summary of Experience:

I am having Bachelor Degree in Electrical Engineering qualifition with 25
years working experience on High Voltage and Low Voltage Electrical
Equipments.

14 years with National Electricity Broad of Malaysia involved in
Installation and Maintenance of High Voltage and Low Voltage Electrical
Equipments.

11 years with Oil and Gas field involved in Installation and Maintenance
of High Voltage and Low Voltage Electrical Equipments.

Experience to help you Achieve your company mission.

This experience includes expertise in:



. TNB (National Electricity Broad of Malaysia) High Voltage and Low
Voltage Electrical Equipment Installation and Maintenance (Malaysia
Selangor)
. Rotary Mec MLNG Electrical Maintenance Project (Sarawak Bintulu)
. FPSO PERINTIS Electrical Maintenance (Kemaman)
. Muhibbah Petrochemical Engineering High Voltage Electrical Equipment
and Transmission Line Installation (EPCC Project SUDAN Oil Field)
. Rotary Men Electrical Maintenance work at (SUDAN Oil Field)


In addition, I have an excellent rapport with my fellow workmates and I
work well under pressure. I have clean record of no ill health days and an
excellent accident free work history. I am a keen learner and am prepared
to undergo any courses or training which will further my experience in the
oil industry.



You will find I am dependable, hard working individual that always gives
110%. I am a big believer in discipline and on all occasions strive to be a
team player. I insist on achieving deadlines on or before target dates and
never compromise on safety issues. I am very perceptive which has allowed
me to handle crisis situation before they became major.















Employment History:


Organization: Rotary Mec (M) sdn bhd

Work Period: November 2006 till March 2009

Position: Senior Electrical Engineer

Project : Maintenance Package Field Surface High Voltage
Equipments
Project for White Nile (5B) Petroleum
Operating Company Ltd, SUDAN

Key Responsibilities:

. Main responsibilities preparing maintenance schedule with CMMS
software
. Attending daily meetings with Clients.
. Proposesing to upgred Field system with Client and negotiate matters
related to maintenance shutdown
. To establish Maintenance Strategy and Execution Plan.
. Compile operating budget for the project and spare part.
. Asigning day to day duitis to team leads
. Preparation and submission of daily weekend monthly Reports to client.
. Manpower management workers accommodation and Social matters
. Attend safety meeting with safety personnel's staffs
. Attending break down works

Reporting to General Manager
Nature of duties:

. Routing maintenance and Inspection of SF6 33kV circuit breakers
. Routing maintenance and Inspection of 11kV vacuum circuit breaker
. Routing maintenance and Inspection of 6.6kV vacuum circuit breakers
. Routing maintenance and Inspection of 400VCB and 400ACB
. Routing maintenance and Inspection of VSD, UPS
. Routing maintenance and Inspection of electrical system for HV motors
6.6kV
. Routing maintenance and Inspection of 6 oil gathering manifords(OGM)
Ring Main Unit (RMU) 33/0.42kV and Compact Substation
. Routing maintenance and Inspection of 28 well heads Ring Main Unit
(RMU) 33/0.42kV and Compact Substation
. Routing maintenance and Inspection of 48kM transmission line






Transformers Installation
. Routing maintenance and Inspection of 4 units of step-up Transformers
20/25MVA 11/33kV
. Routing maintenance and Inspection of distribution Transformers
10/12.5MVA 33/11kV
. Routing maintenance and Inspection of distribution Transformers
10/12.5 MVA 11/6.6kV
. Routing maintenance and Inspection of distribution Transformers
1600kVA 6.6/0.42kV
. Routing maintenance and Inspection of NER

. Transformers oil filltertion
































Organization: MUHIBBAH PETROCHEMICAL ENGINEERING SDN BHD


Work Period: January 2005 to September 2006

Position : Project Manager


Project : EPCC of Package 3- Field Surface Facilities for
Thar Jath Development
Project for White Nile (5B) Petroleum
Operating Company Ltd, SUDAN


Key Responsibilities:

. To manage the company's operation activities.
. Oversees and manage all Project and Contracts secured by the company.
. To establish Project Strategy and Execution Plan.
. To select competent sub-cuntractors.
. Attend meetings and negotiate with Client, consultant, Contractors and
Suppliers on matters related to execution of Project
. Ensure Project is out efficiently, effectively and completed within
the contract period.
. Ensure that the company policies are effectively implemented.
. Compile operating budget for all project.
. Manpower management workers accommodation and Social matters
. Reviewing all Drawing before construction
. Attend safety meeting with safety personnel's staffs

Reporting to General Manager


Nature of duties:

. Installation of SF6 33kV circuit breakers
. Installation of 11kV vacuum circuit breaker
. Installation of 6.6kV vacuum circuit breakers
. Installation of 400VCB and 400ACB
. Installation of VSD, UPS
. Installation of cable system for HV motors 6.6kV
. Installation of 6 oil gathering manifords(OGM) Ring Main Unit (RMU)
33/6.6kV and Compact Substation
. Installation of 28 well heads Ring Main Unit (RMU) 33/6.6kV and
Compact Substation
. Installation of 48kM transmission line






Transformers Installation
. Installation of 4 units of step-up Transformers 20/25MVA 11/33kV
. Installation of distribution Transformers 10/12.5MVA 33/11kV
. Installation of distribution Transformers 10/12.5 MVA 11/6.6kV
. Installation of distribution Transformers 1600kVA 6.6/0.42kV
. Installation of NER

. Transformers oil filltertion

. Laying and termination of contor cables

. Laying and termination of power cable





























Organization : TRENERGY FPSO PERINTIS OPERATING COMPANY
Work Period : January 2003 to December 2004



Position : Head Electrical Engineer



Key Responsibilities:

. To establish Maintenance Strategy and Execution Plan.
. Main responsibilities preparing monthly PM and CM schedule and
executing.
. Compile for spare part.
. Attend safety meeting with safety personnel's staffs
. Preparation year end CM schedule for electrical




Reporting to Operation Manager

Nature of duties:
. Routing maintenance and Inspection of 11kV Vacuum circuit breaker
. Routing maintenance and Inspection of 6.6kV Vacuum circuit breaker
. Routing maintenance and Inspection of 400VCB and 400ACB
. Routing maintenance and Inspection of VSD, UPS
. Routing maintenance and Inspection of all small electrical systems.
Transformer Maintenance

. Step-up Transformers 1600kVA 415kVA/11kV
. Distribution Transformers 1600kVA 6.6/0.42kV
. Gen set electrical system
. HV motors 6.6kV and pumps
















Organization : ROTARY MEC (M) SDN BHD

Work Period : February 1998 to December 2002

Position
: Lead Electrical Engineer

Project: MLNG 3 Electrical maintenance testing and commissioning

Key Responsibilities:

. To establish Project Strategy and Execution Plan.
. Compile operating budget for all project.
. Preparation and submission of daily weekend monthly Reports
. Manpower management workers accommodation and Social matters
. Attending progress meeting with Client
. Attend safety meeting with safety personnel's staffs
Reporting to Senior Electrical Engineer

Nature of duties:

. Routing maintenance and Inspection of 33kVVacuum Circuit Breake

. Servicing and overhauling of 33kV Vacuum Circuit Breakers

. Routing maintenance and Inspection of11kV Vacuum Circuit Breake

. Servicing and overhauling of 11kV Vacuum Circuit Breakers

. Routing maintenance and Inspection of 6.6kV Vacuum Circuit Breake

. Servicing and overhauling of 6.6kV Vacuum Circuit Breaker

. Routing maintenance of 400VCB and 400ACB

. Routing maintenance of HV motor and pumps 6.6kV

. Routing maintenance and Inspection of 400VCB and 400ACB

. Routing maintenance and Inspection of VSD

. Battery check including individual battrey cells

Transformer Maintenance

. Routing maintenance and inspection of 30MVA 33/11kV

. Distribution Transformers 10MVA 11/ 6.6kV

. To check level and carry out dielectric acidity testing on oil.

. Testing of On load Tapchanger operation

. Overhauling On load Tapchanger changing of moving contracts

. Fillteration of transformers oil if necessary





Organization : TNB (National Electricity Board)

Department : Sub-Station Maintenance of 275/132/33kV Equipments

Work Period : December 1994 to January 1998

Position : Lead Electrical Engineer

Key Responsibilities:

. To manage the company's operation activities.
. Oversees and manage all Projects.
. To establish Project Strategy and Execution Plan.
. Ensure Project is out efficiently, effectively and completed within
the contract period.
. Ensure that the company policies are effectively implemented.
. Compile operating budget for all project.
. Manpower management workers
. Reviewing all Drawing before construction
. Attend safety meeting with safety personnel's staffs
Reporting to Senior Electrical Engineer

Nature of duties:

. Routing maintenance and Inspection of 275kV GIS Breakers

. Routing maintenance and Inspection of 132kV GIS Breakers

. Routing maintenance and Inspection of 33kV Vacuum Circuit Breakers

. Routing maintenance and Inspection of 11kV Vacuum Circuit Breakers

. Servicing and overhauling of 275/132/33/11kV of breakers when its
require

. 110V Battery check including individual battrey cells

Transformer maintenance 240MVA, 180MVA, 90MVA, 60MVA, 30MVA

. Routing maintenance and inspection for transformers

. To check level and carry out dielectric acidity testing on oil.

. Testing of On load Tapchanger operation

. Overhauling On load Tapchanger changing of moving contracts

. Fillteration of transformers oil if necessary












Organization : TNB (National Electricity Board)

Department : Sub-Station Projects

Work Period : September 1992 to November 1994

Position : Lead Electrical Engineer

Project : Installation of High Voltage Electrical Equipments
for

Two Units 275/132/33/11kV Gas Insulated Sub-
Station (GIS).

Key Responsibilities:

. To manage the company's operation activities.
. Oversees and manage all Projects.
. To establish Project Strategy and Execution Plan.
. Ensure Project is out efficiently, effectively and completed within
the contract period.
. Ensure that the company policies are effectively implemented.
. Compile operating budget for all project.
. Manpower management workers
. Reviewing all Drawing before construction
. Prepareing control cable schedule
. Attend safety meeting with safety personnel's staffs
Reporting to Project Electrical Engineer

Nature of duties:

Installation of 275/132kV GIS Equipments

. Busbar

. Isolator

. Maintenance earthing switch

. Circuit Breakers

. Current transformer

. Voltage transformer

. Line isolator

. High-speed earthing switch

. Busbar enclosure

. Filling of SF6 gas











Installation of 275/132/33/11kV indoor equipments.

. Installation of 33kV Vacuum Circuit Breakers and Busbars

. Installation of 11kV Vacuum Circuit breakers and Busbars

. Installation of 33kV and 11kV control planes

. Installation of 132kV control plane

. Installation of 275kV control plane

. Installation of DC system

Transformers Installation

. Installation of 240MVA 275/132kV Auto Transformers

. Installation of 90MVA 132/33kV Power Transformers

. Installation of 30MVA 33/11kV Power Transformers

. Installation of NER

. Transformers oil filltertion

. Laying and termination of contor cables

. Laying and termination of power cable

. Testing and commissioning







































Organization : TNB (National Electricity Board)

Department : Sub-Station Projects

Work Period : July 1990 to August 1992

Position : Lead Electrical Engineer

Project : Installation of High Voltage Electrical Equipments
for

Two Units 275/132/33/11kV Sub-Station.

Key Responsibilities:

. To establish Project schedule
. Preparation and submission of daily weekend monthly Reports
. Manpower management
. Reviewing all Drawing before construction
. Prepareing control cable schedule
. Attend safety meeting with safety personnel's staffs
Reporting to Project Electrical Engineer

Nature of duties:

Installation of 275/132/33/11kV indoor equipments.

. Installation of 33kV Vacuum Circuit Breakers and Busbars

. Installation of 11kV Vacuum Circuit breakers and Busbars

. Installation of 33kV and 11kV control planes

. Installation of 132kV control plane

. Installation of 275kV control plane

Installation of 275/132kV outdoor equipments

. Gantry beam for line

. Line trap

. Surge arresters

. Isolators line side

. Current transformer

. Voltage transformer

. Earthing switch

. Circuit breaker

. Busbar CVT

. Busbar







Transformers Installation

. Installation of 240MVA 275/132kV Auto Transformers

. Installation of 90MVA 132/33kV Power Transformers

. Installation of 30MVA 33/11kV Power Transformers

. Installation of NER

. Transformers oil filltertion

. Laying and termination of contor cables

. Laying and termination of power cables

. Testing and commissioning















































Organization : TNB (National Electricity Board)

Department : Sub-Station Projects

Work Period : October 1987 to June 1990

Position : Electrical Engineer

Project : Installation of High Voltage Electrical Equipments
for

Three Units132/33/11kV Sub-Station.

Key Responsibilities:

. Preparation and submission of daily weekend monthly Reports
. Manpower management


Reporting to Lead Electrical Engineer

Nature of duties:

Installation of 132/33/11kV indoor equipments.

. Installation of 33kV Vacuum Circuit Breakers and Busbars

. Installation of 11kV Vacuum Circuit breakers and Busbars

. Installation of 33kV and 11kV control planes

. Installation of 132kV control plane

. Installation of DC system



Installation of 132kV outdoor equipments

. Gantry beam for line

. Line trap

. Surge arresters

. Isolators line side

. Current transformer

. Voltage transformer

. Earthing switch

. Circuit breaker

. Busbar CVT

. Busbar









Transformers Installation

. Installation of 90MVA 132/33kV Power Transformers

. Installation of 30MVA 33/11kV Power Transformers

. Installation of NER

. Installation of 90 MVA and 30 MVA Transformers including oil
filltertion

. Laying and termination of contor cables

. Laying and termination of power cables

. Testing and commissioning


















































Organization : TNB (National Electricity Board)

Department : Sub-Station Projects

Work Period : August 1986 to September 1987

Position : Electrical Engineer

Project : Installation of High Voltage Electrical Equipments
for

Three Units indoor 33/11kV Sub-Station



Key Responsibilities:

. Preparation and submission of daily weekend monthly Reports
. Manpower management





Reporting to Lead Electrical Engineer

Nature of duties:

. Installation of 33kV Vacuum Circuit Breakers and Busbars

. Installation of 11kV Vacuum Circuit breakers and Busbars

. Installation of 33kV and 11kV control planes

. Installation of DC system

Transformers Installation

. Installation of 30MVA Power Transformers

. Installation of NER

. Installation of 30 MVA Transformers including oil filltertion

. Laying and termination of contor cables

. Laying and termination of power cables

. Testing and commissioning






















From April 1983 till August 1986





Went on study

Leave To India.































Organization : LLN (TNBT) National Electricity Board of Malaysia

Department : 33/11kV Sub-Station Maintenance

Work Period : April 1981 to May 1983

Position : Electrical Technician

Key Responsibilities:

. To carry out maintenance works for 60 sub-station in the state of
Selangor

The radius of 500km

Reporting to team Leader Electrical Engineer

Nature of duties:

. Routing maintenance and Inspection of 33/11kV oil-circuit-breakers

. Servicing and overhauling of 33/11kV oil-circuit-breakers

. Routing maintenance and Inspection of 33/11kV vacuum circuit breakers

. Servicing and overhauling of 33/11kV vacuum circuit breakers

. 110V Battery check including individual battrey cells

Transformer maintenance 15MVA to 30MVA

. Routing maintenance and inspection for transformers

. To check level and carry out dielectric acidity testing on oil.

. Testing of On load Tapchanger operation

. Overhauling On load Tapchanger changing of moving contracts

. Fillteration of transformers oil if necessary

Quick Profile Summary

chandrakumar perumal
Name: Chandrakumar Perumal
Link: http://www.salespider.com/p-6889513/chandrakumar-perumal
Location:

Explore using SaleSpider

Businesses You May Be Interested In

 Business Picture
 Business Picture
 Business Picture
 Business Picture

People you may know from

 Business Picture
 Business Picture
 Business Picture
 Business Picture

Chandrakumar Perumal’s Business Connections

Find more information on the Company

Share This Profile

Member Spotlight

jerry davidson Icon
Jerry Davidson
Benchmark Capital Funding

Business Spotlight

Compliance PhD Icon
Compliance PhD
Http://www.compliancephd.com/
»
»
chandrakumar perumal
Who Viewed This Page
458376 views
Last Seen
Thursday August 11, 2016
Top Cities
Delhi 1.7%
Toronto 1.17%
Bangalore 1.1%
Top Browser
Chrome Chrome51.56%
Iphone16.42%
Firefox Firefox14.07%
OS Expand
Windows
42.06%
Android
27.51%
Iphone
16.91%
Device Expand
Desktop
50.37%
Mobile
43.63%
Tablet
5.99%
Language Expand
En-US
64.76%
En-us
17.89%
En-GB
2.84%
spacer pixel