Close
Overlay

Willy Olila -

Willy Olila
Send Message
Connect

About Willy Olila

Willy+Olila
Willy Olila and is interested in Construction.
Not the person you're looking for?
Find more results for Willy Olila

Location

Categories of Interest

Construction

Resume

ENGR. WILLY O. OLILA
(CIVIL
ENGINEER)
P.O.Box 12455, Ruwais, Abu
Dhabi U.A.E
Email Add:
willyolila@yahoo.com
Cel # :
+971509279416

PERSONAL DATA:

Nick Name : Willy
Date of Birth : October 18, 1978
Place of Birth : Poblacion Capalonga,
Camarines Norte
Sex : Male
Height : 5'6"
Weight : 142 lbs
Civil Status : Single
Religion : Roman Catholic
PRC Reg. No. : 0094790

EDUCATIONAL ATTAINMENT:

Board Passer : November 2002 Civil Engineers Board
Examination

College : University of Batangas (BSCE
Accredited level II) 1996-2002

OJT : Cadet Engineer 97% @ First
Gass; Santa Rita, Batangas City

High School : Capalonga Institute
(Capalonga,Camarines Norte) 1991-1996

Elementary : Capalonga Central Elementary
School 1985-1991
Capalonga,
Camarines Norte

OVERSEAS WORK EXPERIENCE:

SAMSUNG CORPORATION (Korean Corps.)
August 2008 to Present
P.O.Box 12455, Ruwais, Abu Dhabi U.A.E
Tel No. +91728761181 (Local) 219 or 243
Position: Steel Structural and Piping QC/Inspector
Project : BOROUGE 2 OCU PROJECT (OLEFINS CONVERSION UNIT)
Location: Ruwais Industrial Park,Ruwais Abu Dhabi U.A.E

WORK AND RESPONSIBILITY:


As Steel Structural Inspector


. Monitoring Daily activities based on approved plans and
specification (Borouge 2 Specs/AWS D1.1) and makes CPAR/SR
(Corrective/Preventive Action Request/Surveillance report)
for quality comments if necessary.
. Review material receiving documents (Package list/mill
certificates and certificate of origin if necessary).
. Conducting inspection as per AFI (Application for inspection)
based on approved ITP (Inspection test plan).SUCH AS
. Inspection of steel structure materials received from South
Korea and other countries and prepares material inspection
report.
. Padding elevation (Bearing devices) inspection and
preparation of there inspection reports to submit for our
client representative (Consultant) to review and final
acceptance of the structure.
. Verticality alignment (Plumbness) Inspection and preparation
of there inspection reports.
. Welding visual inspection for all welded members and gusset
plates as per approved WPS/PQR.
. Witnessing the NDE/MPI (Non-destructive examination/Magnetic
particle test) for welded members.
. Bolts tighten inspection (A325 and A490 bolts with torque
head) and preparation of there inspection reports.
. Dry Film Test (DFT) for painted steel structures.
. Punch listing for structures nearly finish such as gratings,
hand rails and other steel structure accessories.
. Preparation and up-dates TAP system (Turn-over Auto Package
system) for all reports filling.
. Attend quality forum with our client representatives.
. Conducting weekly quality toolbox meeting to all steel
structure workers for quality developments.


As Piping QA/QC (New/Additional Responsibility and practice)
started on December 2008

. Monitoring Daily activities based on approved plans and
specification (Borouge 2 Specs/ASME) and makes CPAR/SR
(Corrective/Preventive Action Request/Surveillance report)
for quality comments if necessary.
. Conducting inspection as per AFI (Application for inspection)
and approved ITP (Inspection test plan).SUCH AS
. Visual inspection for daily Fit-up of pipes as per required
Bevel angle, Root gap, High-low of pipes.
. Visual inspection of field welded joints as per plan, ASME
B31.3 and Borouge Specifications.
. Line checking for every package test as per plan and
orientation.
. Preparation of daily fit-up and field weld reports.
. Daily inspection for PWHT (Post weld heat treatment) pipes
and review temperature graph.
. Witness during magnetic particle inspection (MPI) with third
party.
. Witness during positive material identification (PMI) of
welded joints with third party.
. Witness for hydro test and identification of leak during
hydro testing (As per hydro test procedure).
. Witness for Pnuematic test (Fire fighting system) and
identification of leak during testing.
. Monitoring of pressure/temperature graph for hydro/Pnuematic
test.
. Preparation of reports for Hydro/Pnuematic test.
. Conducting bi-monthly quality toolbox meeting to all pipe
fitter and welders for quality developments.
. OTHER INSPECTION AND TESTING FOR PIPING WORKS WAS HOLDING BY
CO-PIPING INSPECTORS OF OUR DEPARTMENT.



FUTURE HORIZON CO. (2nd Project)
P.O Box 102 Al-Hajami St. Al-Riyadh, Bisha K.S.A
Position: Project In-Charge (With Historical Salary Increment)
June 2006-Aug.2007
Project : Al-Sofan Premary (Boys) School
(A Two-Storey School Building with Theater and
Basketball court)
Location: Al-Sofan, Bisha K.S.A

WORK AND RESPONSIBILITY:

. Preparation of project monthly work schedules (Submitted to
the main office and Ministry of education two months before
work implementation).
. Preparation of monthly accomplishment reports with
explanation to the Ministry of education consultant.(MONTHLY
BILLING PURPOSES)
. Attended to the weekly coordination meeting with Future
Horizons Construction manager and Ministry of education
Consultant.
. Preparation of Bi-Monthly Materials and equipment needed to
the project and submit as material request to the main office
at least 2-weeks before project needed (for fast moving
materials only).
. Preparation of steel cutting list one month before the steel
works progress and to submit at steel fabrication
department.(For structural work only)
. Conform work activities with contract
requirements,drawings,specification and method of statements.


. Review specs, drawing and clarify unclear issues.
. Monitoring of daily work accomplishment required as per
project target scheduled.
. Monitoring man-power work with safety.
. Monitoring man-power work with quality.
. Ensure compliance all contractual/company and local authority
requirements for quality.
. Work preparation need a reference elevation or leveling with
used of leveling machine.
. Preparation of inspection request follows the site inspection
with Ministry of education and other staffs.
. Preparation of daily manpower report included overtime and
tardiness of the labors.











FUTURE HORIZONS CO. (1st Project)
P.O Box 102 Al-Hajami st. Al-Riyadh,Bisha K.S.A
Position : Site/Office Engineer
July 2005-May 2006
Project : Al-Mahamodia Secondary (Boys) School

(A Four-Storey School Building worth of 4.5-
million dollars project)
Location : Al-Namas Chamber of Commerce, Abha K.S.A


WORK AND RESPONSIBILITY:

. Plan and specs. Implementation.
. Preparation of materials bill of quantity needed at the
project as per scope of work at least two months submitted to
the main office before work implementation.
. Preparation of equipment request needed to the project
. Preparation of Daily accomplishment report needs to submit
thru e-mail for the main .office file.
. Daily man-power reports included overtime and tardiness of
the labors.(by used of CCDE prog.)
. Man-power safety motivations and implementation.
. Monitoring the quality and quantity of works.
. Preparation of sample or tested report materials need to
submit for the Ministry of education consultant office.

WORK EXPERIENCE :( UP-DATED LOCAL)

CCT Constructors Corporation (Japanese Corps.)
October 5, 2007 - July 31, 2008
3rd flr,Princess Bldg. 104 Esteban str. Legapi Village Makati City

PROJECT FINISHED (GENERAL CONTRUCTOR)
PROCTER & GAMBLE PLANT PROJECT
Oct. 5, 2007 - April 5, 20008
PROJECT CONTRACT: 221,645,000.00 PESOS
Position : Site Supervisor
Location : N0.10 Main Ave. LISP 1,Cabuyao,Laguna

PANASONIC FACTORY RENOVATION WORKS April
6, 20008 - July 31, 2008
PROJECT CONTRACT: 40,009,000.50 PESOS
Position : Project Engineer
Location : Laguna Technopark, Sta.Rosa,Laguna

ACM Group of Companies
January 2003 - June 2005
105 CSJ Building Aguirre St. Legaspi Village,Makati City
(JOB DESCRIPTION SEE ATTACHED W/ CREDINTIALS)

DUTCHBOY Phil. /EXUDUS Int'l. Const. Corp.
March 2003 -December 2003
Position : Project In-charge/Project
coordinator/Supervisor/Safety Engineer/Q.C Engineer
(The one ARMY of Dutchboy/Exudus joint
venture at project location).
Location : One Legaspi Park Project Cor. Legaspi
st.&Rodriguez St.
Makati City (Painting works for 46th
Storey residential Bldg.)

EXODUS Int'l. Const. Corp.
January 2003-May 2003
Position : Project Supervisor and Safety Engineer
Location : Intel Phils.(Gate Way)
Brgy. Javalera Gen. Trias Cavite.

WORK AND RESPONSIBILITY:
As project supervisor:
. Planning and assigning all manpower needed in the working area.
. Supervise and Monitor the painting works to assure conformity in
the application Methodology and Specification.
. Regular updates the construction status in anticipation for the
inspection.
. Prepare a monthly accomplishment report.
. Attend coordination meeting with other contractors, Intel Phil.
Supervisors.
As project Engineer:
. Conducting a daily safety toolbox meeting at least 1 hour before
work starting.
. Make sure that the manpower had wearing a PPE's before going at the
Work area, especially at the elevated working area.
. Supervise and monitor the manpower in every working hour for safety
purposes.
. Attend a weekly safety meeting with the Intel Phil. Safety
Supervisors and Other contractors.
. Prepare bi-monthly PPE's status report.



KNOWLEDGE /SKILLS:

AUTO CAD 2007 3D
AUTO CAD 2007 2D
PROJECT PLANNER (USING PRIMAVERA 3.0)
CCDE Prog.(For attendance use )
MS EXCEL
MS WORD
BUSINESS OWNER:

. W/I Design and Construction
Unit -F Cor. John and Mathew St.
Vina, Village, Imus Cavite
DTI #: 00333756
Sub-Office : WJG 2nd Floor Lutos Mall, Nueno Ave. Imus Cavite



SERVICE OFFERED:
. Project Planner and scheduler
. Project Estimator
. Architectural and Structural Designer
. Construction and Renovation ( Had 20 List of skilled workers)



TRAINING AND SEMINARS ATTENDED:
. Safety Awardee
500,000 man-hours with out any lost time accident.
Procter and Gamble building-34 Project
No. 10 Main Ave. Light Industry and science park 1,Cabuyao,Laguna
. Safety and Reliability in Every Anchoring
POST INSTALLED ANCHOR TECHNOLOGY SEMINAR
Taikisha Phils.
LTI Binan Laguna
May 30, 2008 (See Attached CERTIFICATE)

. Computer-Aided Construction Project Management (Using PRIMAVERA
3.0)
CRESCENT Technologies
Unit 1521-1522 City & Land Mega Plaza
ADB Ave. Ortigas Center, Pasig City
January 23, 2005 (See Attached CERTIFICATE)

. Managing Employees' Safety and Health Program


One Legaspi park project
(EEI) Conference Room,Legaspi Village,Makati City
September 30, 2003


. Fall Protection & Ladder Safety
SHI Training Room, 2106 V.V Soliven Bldg.
EDSA,Greenhills,San Juan Metro Manila (April 3, 2003)


. Advanced Chemical Safety
SHI Training Room, 2106 V.V Soliven Bldg.
EDSA,Greenhills,San Juan Metro Manila (April 3, 2003)

. Respirator Safety
SHI Training Room, 2106 V.V Soliven Bldg.
EDSA,Greenhills,San Juan Metro Manila (April 3, 2003)

. Control of Hazardous Energies
SHI Training Room, 2106 V.V Soliven Bldg.
EDSA,Greenhills,San Juan Metro Manila (April 3, 2003)



SPORTS:
TABLE TENNIS
SINGLE PLAYER
LONG TENNIS
FOUR PLAYERS
BILLIARD
SINGLE PLAYER




CHARACTER REFERENCES:

Mr. Arnold C. Magpantay
Engr. Angel Cruz Jr.
(Structural Steel Supervisor)
(Planing Engineer)
Samsung Corp.
Samsung Corp.
Borouge OCU 2 Project
Borouge OCU 2 Project
Ruwais industrial park,Abudhabi UAE Ruwais
industrial park, Abudhabi UAE
Cel # :+971503085938
Cel # : +971509279481

I hereby certify that the above information is true and correct based
on my knowledge and belief.





Applicant's Signature

Quick Profile Summary

Willy Olila
Name: Willy Olila
Link: http://www.salespider.com/p-6508241/willy-olila
Location:

Explore using SaleSpider

Businesses You May Be Interested In

 Business Picture
 Business Picture
 Business Picture
 Business Picture

People you may know from

 Business Picture
 Business Picture
 Business Picture
 Business Picture

Willy Olila’s Business Connections

Find more information on the Company

Share This Profile

Member Spotlight

Business Spotlight

Phil Klein Insurance Group Icon
Phil Klein Insurance Group
Http://www.philkleininsurance.com/
»
»
Willy Olila
Who Viewed This Page
458376 views
Last Seen
Thursday August 11, 2016
Top Cities
Delhi 1.7%
Toronto 1.17%
Bangalore 1.1%
Top Browser
Chrome Chrome51.56%
Iphone16.42%
Firefox Firefox14.07%
OS Expand
Windows
42.06%
Android
27.51%
Iphone
16.91%
Device Expand
Desktop
50.37%
Mobile
43.63%
Tablet
5.99%
Language Expand
En-US
64.76%
En-us
17.89%
En-GB
2.84%
spacer pixel